I have finished the hardest part of the attic work. I laid enough floor (2×8 OSB, cut to fit around cross-beams while kneeling in our shallow attic) to get to where the bathroom exhaust fans are. After some fruitless digging through a foot or two of insulation, I crawled out and texted April asking her to turn the fans on.

And then I crawled back in. To reach the master bathroom, it’s tighter than the crawlspace under our house. Once I’m in there, I can’t turn around, I just have to wiggle backward to get out. It’s like spelunking, but infinitely less terrifying. Except that there are electrical wires and I couldn’t turn off the electricity because I needed the damned fan to be on so I could find it.

Once it was on, I realized that I was only about 2.5 feet away from it. The rush of excitement when I cleared enough insulation for the exhaust vent to start blowing insulation was amazing.

Finding the hallway bathroom one was a bit easier–I could at least kneel over there. And it already had a duct, albeit one that is far too short and just goes into the attic. And it was covered in insulation.

But now I’ve found both, so the next steps are pretty easy:

  1. Call the roofing company to schedule a time when they can install the vent hoods. (I could do the work myself, but by paying them to install and seal, it maintains my warranty and they’ll have to handle any leaks that arise.)
  2. On the morning they’re due to arrive, I’ll go back up into the attic with the ducts (which I need to buy) and trace their circumference on the decking where I want them to connect to the hoods.
  3. Drill 8 holes on the circumference line through the decking. For each duct, I’ll leave a drill bit stuck through the decking so it pushes the shingles up and is easy to find from the top side.
  4. The roofer will pull the shingles back and I’ll cut through the roof from above with a jigsaw.
  5. Once the roofer is done installing the vent hoods, I’ll get back into the attic, attach the ducts to the hoods, and tape them.

I also need to get some insulation and seal up a section of our return vent ductwork (heating/cooling).

But all of this will have to wait a month. I leave for the Atlassian Summit conference in Las Vegas tomorrow. I’ll get back on Friday, and then four days later we’re going to Canada to visit Eric and Stephanie.

So close to done. It’ll feel really good to have this project closed out.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.